Elevator Rib Riveting

Good progress!  The elevators are going to come together any day now.  Just so happens that day will be after Oshkosh…

Things were going swimmingly with 4 of us working at once.  We set up a wonderful assembly line to back rivet the elevator rib halves.  So wonderful that we managed to neglect the fact that the top/bottoms are swapped left/right.

So, the day ended with the humiliating drilling of 64 rivets.  I think we’re pretty good at drilling out rivets, now.

IMG_2956 IMG_2954 IMG_2953 IMG_2952 IMG_2951 IMG_2942 IMG_2940 IMG_2934 IMG_2932 IMG_2931 IMG_2929 IMG_2927 IMG_2924 IMG_2923 IMG_2922 IMG_2921 IMG_2913 IMG_2907

Berck: 8 hours, Randy: 8 hours, Tracey: 7 hours, Jonah: 4 hours.