More Horizontal Stabilizer Work

We did work on the Horizontal Stabilizer on Saturday.  I didn’t post anything because I forgot to take pictures, and we stopped fairly early.

We got the front spar doubler and the brackets all riveted together.  There’s primer here because we made some significant scratches that I sanded out (through the alclad), plus I wasn’t sure about whether these brackets should be primed or not.

IMG_20140414_175942

I’ve spent a couple of hours working on these silly ribs:IMG_20140414_180044

We’re planning on a fairly short day Saturday as well, but hopefully something that looks like a horizontal stabilizer will be in these photos before long!

Berck: 8 hours, Randy: 5 hours.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.