We did work on the Horizontal Stabilizer on Saturday. I didn’t post anything because I forgot to take pictures, and we stopped fairly early.
We got the front spar doubler and the brackets all riveted together. There’s primer here because we made some significant scratches that I sanded out (through the alclad), plus I wasn’t sure about whether these brackets should be primed or not.
I’ve spent a couple of hours working on these silly ribs:
We’re planning on a fairly short day Saturday as well, but hopefully something that looks like a horizontal stabilizer will be in these photos before long!
Berck: 8 hours, Randy: 5 hours.