Aileron Counterbalance Tube Drilling

IMG_20160103_134747835

IMG_20160103_134842795

This involved putting the nose skins on, taking the nose skins off, putting the nose skins on, and taking the nose skins off.  Here’s a photo before taking them off the last time.

IMG_20160103_184946352

Only tricky bit here was that the nose ribs didn’t want to align with the skins after bolting them to the counterbalance tube.  There was just enough play after loosening the bolts and holding them outward while I re-tightened them that they lined up just fine the second time.

Berck: 5 hours

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.