No pictures, but Berck & Will drilled a bunch of holes in the right fuel tank. Most of them were supposed to be there.
Berck: 5 hours, Will: 5 hours.
RV-10 Build Log
No pictures, but Berck & Will drilled a bunch of holes in the right fuel tank. Most of them were supposed to be there.
Berck: 5 hours, Will: 5 hours.
Randy and I put the right wing leading edge on. We made some progress on the right fuel tank, too…
Berck: 6 hours, Randy: 6 hours