Minor progress

First day after work this week actually making forward progress on the plane.   Other days were involved in indirect things like hanging more lights in the garage.

Most of the progress was disassembling, deburring, reassembling.  Ready for some more holes to be drilled.  The white, powder-coated bits are the hinge brackets for the rudder.  The VS-1008 doubler that I spent 2 hours deburring is on the front of the spar (underside in this picture), so you can’t even see it.

I spent a fair amount of time looking for the hinge brackets.  They were in with the little parts that Jonah put in bins.  I hadn’t realized that there were parts like that in the bins, so I searched the shelves far and wide, first.  I also have come to the conclusion that (as I suspected) we have arranged the parts on the shelf in a most ridiculous way: by subkit.  The subkits were just for their packing purposes and are useless for actual parts sorting.  I might take them all down this weekend and re-arrange by component.

IMG_20140227_205158

 

Berck: 3 hours.

Practice kits completed

Since Cleaveland has been a bit slow shipping the remainder of our tools, Jay (who has completed an RV-10, lives in Colorado Springs and is a former coworker of Randy’s)  was extremely gracious and lent us some tools until Cleaveland ships ours.  Including a squeezer, which was necessary to finish the remainder of our practice projects.

IMG_20140223_191525

They’re not beautiful, and we made lots of mistakes.  But that was the idea: make mistakes here for free, so we don’t make them on the plane.  Everything except the really tight quarters riveting on the trailing edge of the airfoil was no big deal.  I found this website which gives a great method for doing this that we’ll try on the airplane.

http://www.experimentalaero.com/Builders%20Tips.htm

If nothing else, we learned that riveting those last few rivets at the end are really hard, and none of the half-dozen ways we tried work very well.

We drilled out plenty of rivets (more than was really necessary, because we figured practice is good), and I even managed to drill through my finger.  Ouch.  That sioux air drill packs a punch, but fortunately it stops as soon as you let off the trigger.

I worked a couple hours this morning, mostly deburring the VS-1008 rear spar doubler.  It’s a fat chunk of aluminum, and the inside sections require a lot of attention.  And, apparently, an entire 1″ scotch brite wheel.

Berck: 2 hours (actual aircraft construction… many more hours on the practice kits)