Posted on 25 January 202127 January 2021Baggage Closeout Panel / Baggage Corrugations Berck, Jonah: 6.5 hours
Posted on 23 January 202127 January 20211/23/21 Installed the rest of the baggage floor rivets and bits surrounding the baggage door. Berck: 4 hours, Jonah: 2.75 hours