Berck, Jonah: 6.5 hours
1/23/21
Installed the rest of the baggage floor rivets and bits surrounding the baggage door.
Berck: 4 hours, Jonah: 2.75 hours
RV-10 Build Log
Berck, Jonah: 6.5 hours
Installed the rest of the baggage floor rivets and bits surrounding the baggage door.
Berck: 4 hours, Jonah: 2.75 hours