Posted on 31 May 201419 June 2014Elevator Deburring Complete Along with some assembly! Berck: 10 hours, Randy: 8 hours, Jonah: 7 hours.
Posted on 30 May 2014Elevator Beginnings After a week or so off, we’re back to it. Elevator construction starts with separating 16 bits of metal into 32 elevator stiffeners. We started deburring them tonight. Berck, Jonah: 1.5 hours