Posted on 23 January 202127 January 20211/23/21 Installed the rest of the baggage floor rivets and bits surrounding the baggage door. Berck: 4 hours, Jonah: 2.75 hours
Posted on 17 January 202118 January 2021Baggage Floor riveted, Comm Antenna Wired Cutting off the tab Jonah had just deburred Berck: 7 hours, Jonah: 6 hours