Posted on 21 March 202011 April 2020Dimpling and drilling upper fuselage substructure Jonah: 1 hour, Berck: 5 hours
Posted on 8 March 202014 March 2020Brake line investigation Berck and Randy did much investigation about brake lines and installed the valve for the parking brake. Tracey deburred. Berck, Randy, Tracey: 6 hours