We got the leftt wing top skin drilled. With the wing walk doublers. And then we took it apart and deburred it. Will helped. He even has some pictures, so I hear. Which is good, because I don’t.
Berck: 8 hours, Randy: 6 hours, Will: 4 hours.
RV-10 Build Log
We got the leftt wing top skin drilled. With the wing walk doublers. And then we took it apart and deburred it. Will helped. He even has some pictures, so I hear. Which is good, because I don’t.
Berck: 8 hours, Randy: 6 hours, Will: 4 hours.