Posted on 4 July 20179 July 2017Independence Day Jonah and I drilled the pre-punched side skins. Then I drilled the longerons. The edge distance was terrible, so I spent some time consulting the internets and wrote Vans. Berck: 4 hours, Jonah: 2.25 hours
Posted on 3 July 20179 July 2017Side Skins and Longerons in Place Some deburring, a spoiler added, and everything in place to start drilling. Berck, Randy: 6 hours