Step 1 Complete!

The first step was take the vertical stabilizer rear spar caps (VS-1014), and cut off a 16″ wedge of aluminum in order to make them into VS-1014-L and VS-1014-R.  I did this, deburred them, and also deburred the VS rear spar (VS-1003) as well.  It’s such a modest little first step.

Here is the right one done, with the left one untouched.IMG_2315

I never photographed the completed tables with the DRDT-2 mounted between them, so here’s that:IMG_2316

Both spar caps complete:IMG_2317

 

Berck: 2 hours.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.