The first step was take the vertical stabilizer rear spar caps (VS-1014), and cut off a 16″ wedge of aluminum in order to make them into VS-1014-L and VS-1014-R. I did this, deburred them, and also deburred the VS rear spar (VS-1003) as well. It’s such a modest little first step.
Here is the right one done, with the left one untouched.
I never photographed the completed tables with the DRDT-2 mounted between them, so here’s that:
Berck: 2 hours.