I was sure I’d get both floors installed by now, but it turns out everything about these floors is terrible. Especially the solid rivets in the in-between.
Berck: 5 hours, Jonah: 3.5 hours
RV-10 Build Log
I was sure I’d get both floors installed by now, but it turns out everything about these floors is terrible. Especially the solid rivets in the in-between.
Berck: 5 hours, Jonah: 3.5 hours
Berck: 3 hours, Jonah: 2.25 hours